Asphalt Milling & Removal
Commercial asphalt milling and removal for deteriorated pavement, surface reconstruction, pavement rehabilitation, and site preparation throughout Florida
Removing Existing Asphalt With Purpose
When existing asphalt has reached the point where resurfacing or localized repair is no longer the appropriate solution, milling and removal can prepare the pavement area for the next stage of construction or rehabilitation.
Stripe America provides commercial asphalt milling and removal for parking lots, roadways, access areas, drive lanes, and other paved surfaces throughout Florida. Depending on project requirements, milling can remove a specified depth of existing asphalt while maintaining portions of the pavement structure, while full removal can clear the existing pavement to prepare the area for reconstruction.
The appropriate removal method depends on the condition of the existing pavement, the planned improvements, finished elevations, drainage requirements, and the intended use of the property.
What Is Asphalt Milling & Removal?
Asphalt milling is the controlled removal of a specified depth of existing asphalt pavement using specialized milling equipment. The process can remove worn or damaged surface material while leaving the remaining pavement structure in place when conditions and project requirements allow.
Asphalt removal involves taking out existing pavement when a project requires deeper reconstruction, replacement, site modification, or preparation for a new pavement system.
Milling and removal can be used for commercial parking lots, roadways, access lanes, entrances, service areas, and other paved surfaces. Existing pavement thickness, surface condition, elevations, drainage, and the condition of underlying materials all help determine the appropriate approach.
When Is Asphalt Milling or Removal Needed?
Milling or complete pavement removal can become necessary when an existing asphalt surface needs more extensive work than routine maintenance or surface treatment can provide.
WORN SURFACE CONDITIONS
The existing asphalt surface has deteriorated extensively and needs to be removed before a new pavement surface can be installed.
ELEVATION ADJUSTMENTS
Existing pavement levels need to be modified to accommodate drainage, grades, transitions, entrances, or other site requirements.
PAVEMENT REHABILITATION
Existing pavement requires substantial rehabilitation and the damaged asphalt needs to be removed as part of the project.
RECONSTRUCTION PROJECTS
Existing pavement needs to be removed to expose the underlying materials before rebuilding the pavement system.
Commercial Milling & Removal Applications
Milling and removal can serve different purposes depending on the condition of an existing pavement area and what the property needs to accomplish. The scope of work can range from removing a defined asphalt layer to clearing pavement completely for reconstruction.
Parking Lot Rehabilitation
Remove deteriorated asphalt as part of a larger commercial parking lot improvement project.
Roadway Rehabilitation
Prepare existing roadway pavement for reconstruction or additional rehabilitation work.
Pavement Surface Removal
Remove a specified depth of asphalt when the underlying pavement can remain in place.
Failed Pavement Areas
Remove heavily deteriorated pavement where surface damage extends beyond the level suitable for simple repair.
Grade & Elevation Work
Remove existing asphalt where pavement elevations need to be adjusted for site improvements.
Full Pavement Removal
Clear existing asphalt when reconstruction requires access to the underlying pavement structure or site materials.
Planning a Milling or Removal Project? Let's Talk.
Our Asphalt Milling & Removal Process
The scope of milling and removal depends on the existing pavement and the planned improvements. Each project begins by establishing what material needs to be removed and how the pavement area will be prepared for its next stage.
01
PROJECT REVIEW
We examine the existing pavement and understand the planned improvements for the site.
02
MILLING PLAN
The required milling depth or removal scope is established based on project conditions and pavement requirements.
03
SITE PREPARATION
The work area is prepared to allow equipment to safely and effectively access the existing pavement.
04
ASPHALT REMOVAL
Existing asphalt is milled or removed according to the established project scope.
05
MATERIAL HANDLING
Removed asphalt material is collected and handled as required for the project.
06
FINAL SURFACE REVIEW
The exposed pavement area is reviewed and prepared for the next phase of construction or rehabilitation.
What Determines the Right Milling or Removal Approach?
The amount of asphalt that should be removed depends on the condition of the pavement and what needs to happen after removal. Several site and pavement factors can influence the scope of the work.
EXISTING PAVEMENT THICKNESS
The depth and composition of the existing asphalt help determine how much material can or should be removed.
PAVEMENT DETERIORATION
The extent of cracking, failure, and deterioration helps determine whether surface milling or deeper removal is appropriate.
PROJECT ELEVATIONS
Finished grades, drainage, transitions, and surrounding surfaces can affect the required milling depth or removal scope.
NEXT PHASE OF CONSTRUCTION
The planned resurfacing, rehabilitation, or reconstruction work determines how the existing pavement should be prepared.
Asphalt Milling & Removal for Florida Properties
Stripe America provides commercial asphalt milling and removal for properties preparing for pavement rehabilitation, resurfacing, reconstruction, elevation adjustments, and other site improvements. Projects can include parking areas, roadways, access routes, drive lanes, service areas, and other existing paved surfaces throughout Florida.
Apartment Communities
Commercial Developments
Retail Centers
Shopping Centers
Office Buildings
Industrial & Warehouse Properties
Serving commercial properties and pavement projects throughout Florida.
Related Asphalt Paving Services
Milling and removal can be one part of a larger pavement project. Depending on the existing pavement and the intended improvements, other asphalt services may provide the next stage of construction or rehabilitation.
Asphalt Milling & Removal FAQ
What is asphalt milling?
Asphalt milling is a controlled process used to remove a selected depth of existing asphalt pavement. Milling can remove worn surface material while preserving portions of the existing pavement structure when the conditions and project design allow it.
What is the difference between asphalt milling and asphalt removal?
Milling generally involves removing a controlled depth of asphalt while leaving the remaining pavement structure in place. Full asphalt removal involves taking out the existing pavement more completely when a project requires reconstruction, deeper rehabilitation, grade changes, or access to underlying materials.
Why would a commercial property need asphalt milling?
A commercial property may need milling when the existing asphalt surface has deteriorated and needs to be removed before resurfacing or other pavement improvements. Milling can also help establish appropriate pavement elevations and prepare an existing surface for a new asphalt layer.
Can asphalt be milled before resurfacing?
Yes. Milling can be used before resurfacing when removing part of the existing asphalt is necessary to improve surface condition, address deteriorated material, maintain appropriate elevations, or prepare the pavement for a new asphalt layer. The appropriate milling depth depends on the existing pavement and project requirements.
What happens to the asphalt after it is milled?
Milled asphalt material is collected as part of the pavement work and can be handled according to the requirements of the project. Reclaimed asphalt pavement can also have value as a reusable aggregate material, depending on the project and applicable handling requirements.
How do I know if pavement needs milling, removal, or resurfacing?
The appropriate approach depends on the condition of the existing pavement and the intended result. Resurfacing may be suitable when the existing pavement can support a new asphalt layer. Milling can remove deteriorated or excess surface material before resurfacing. More extensive pavement failure may require deeper removal or reconstruction. A project evaluation can help determine the appropriate scope.
Ready to Prepare Your Pavement for Its Next Phase?
Tell us about your existing asphalt, the condition of the pavement, and what you are planning for the property. Stripe America can help determine the appropriate milling or removal approach for your commercial project.